Hwy 43:06 Twinning Sturgeon Lake Indian Reserve

The project, a partnership between the Sturgeon Lake Cree Nation and Alberta Transportation, completes the more than 1,000 kilometres of four-laned highway from Grande Prairie to the Alberta-Montana border at Coutts, part of the CANAMEX Trade Corridor.

Hwy 63:04 Twinning Wandering River

The accelerated twinning of Highway 63 was completed as part of the Alberta government’s commitment to building Alberta’s economic future and providing a transportation network that helps move goods across Alberta to local, national or international markets.

Highway 58:06

As part of the overall widening of Highway 58 from Rainbow Lake to High Level, ARA Engineering completed the design and project management of the last remaining section of Highway 58 to be widened from km 24.000 to km 71.005.

Highway 43:00

As part of Alberta Transportation’s ongoing construction of the North/South Trade Corridor (NSTC), ARA was selected to provide engineering services for the realignment of Highway 43 and adjacent CN Rail line around the community of Beaverlodge, AB.

BF 7721, Standard Bridge Replacement

An existing bridge over Iron Creek, located approximately 8 km north of Lougheed, AB, had reached its service life. Alberta Transportation (AT) retained ARA Engineering to plan and design a 2-span precast concrete bridge to replace the existing 3 span bridge structure.

Hwy 727:02 Spirit River

The project consisted of construction of a new alignment of Highway 727 as the existing alignment was sliding and was becoming impassible. The project included construction of a new alignment through two river valleys as well as upgrading other portions of the existing Highway 727 alignment. 

Highway 2:15

This project involved the construction of overhead sign structures along Deerfoot Trail from south of the Douglasdale overpass to south of the Country Hills Boulevard overpass. The work included the supply and install of 14 overhead sign structures including concrete bases at each site and the removal and disposal of the existing mounted signs at each location.

Asphalt and Concrete Compliance Program Quality Assurance Testing for Asphalt and Concrete

Since 2010, ARA Engineering has been the Prime Consultant providing quality assurance testing for The City of Calgary’s Asphalt and Concrete Compliance Program.